
23
Jun
AEMC: Draft rule giving AEMO more detailed information on generators to help with renewables integration
in Wholesale
Comments
On 20 June 2017 the Commission made a draft rule requiring generators and network businesses to provide the AEMO, with more detailed models of generation systems and other equipment.
It is envisaged that more comprehensive details about operating capability and modelling data can help AEMO in managing a power system with reduced system strength.