AER: draft decision on Murraylink revenue determination for 2018-2023 (submissions by 12 January 2018)

On 31 January 2017, Murraylink submitted its revenue proposal and supporting information to the AER. The proposal sets out the revenue Murraylink proposes to collect from electricity consumers through transmission charges from 2018 to 2023.

On 28 September 2017, the AER released a draft decision on Murraylink’s transmission determination for the 2018–23 regulatory control period.

There will be a stakeholder forum on the draft decision on 11 October 2017. Registrations close on 5 October 2017.

Submissions in response to the draft determination are due by 12 January 2018.

https://www.aer.gov.au/networks-pipelines/determinations-access-arrangements/murraylink-determination-2018-23